Model Farm
Model Farm Solar at Creyke Beck
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Model Farm Solar
- Site name
- Model Farm
- Address
- Model Farm, Atwick Road, Bewholme, North Yorkshire, HU17 0RN
- Grid reference
- Easting 504777, northing 437341
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Creyke Beck
- Bulk supply point
- Beverley 132/33kV
- Primary substation
- Model Farm Solar
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 40 MW registered
- Registered capacity
- 40 MW
- Change to maximum export capacity
- 40 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 26 Apr 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 8 May 2024
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, across 4 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Creyke Beck
GSP view69 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 2.0 GW: 0.6 GW connected, 1.4 GW accepted to connect.
- Kenley House Generation HubKenley House Generation Hub, Solar, Kenley House Generation Hub Direct primaryAccepted150 MW
- Chuch Farm Solar Energy CentreChurch Farm Solar Energy Centre, Solar, Church Farm primaryAccepted75 MW
- Nafferton Road Wind & StorageNafferton Road Wind & Storage, Solar, Nafferton Road Wind & Storage primaryAccepted62.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?