Great Field Lane Generation
Great Field Lane Generation at Creyke Beck
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 16 Jan 2012
- Status
- Connected
- Customer
- Great Field Lane Generation
- Site name
- Great Field Lane Generation
- Address
- Great Field Lane, Great Field Lane, Hull, North Yorkshire, HU9 5NP
- Grid reference
- Easting 515000, northing 429552
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Creyke Beck
- Bulk supply point
- Bransholme
- Primary substation
- Great Field Lane Generation
- Connection voltage
- 33 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 23.75 MW registered
- Registered capacity
- 23.75 MW
- Maximum export capacity
- 23.75 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 2394000089457
- Import MPAN
- Not stated
- Last updated
- 8 Mar 2017
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Creyke Beck
GSP view69 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 2.0 GW: 0.6 GW connected, 1.4 GW accepted to connect.
- Kenley House Generation HubKenley House Generation Hub, Solar, Kenley House Generation Hub Direct primaryAccepted150 MW
- Chuch Farm Solar Energy CentreChurch Farm Solar Energy Centre, Solar, Church Farm primaryAccepted75 MW
- Nafferton Road Wind & StorageNafferton Road Wind & Storage, Solar, Nafferton Road Wind & Storage primaryAccepted62.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?