QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Newport Building

Newport Building PV at Creyke Beck

Northern Powergrid Embedded Capacity Register 1MW and Over, March 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Newport Building PV
Site name
Newport Building
Address
Newport Building, Common Lane, Hull, North Yorkshire, HU15 2FT
Grid reference
Easting 487656, northing 431174
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Creyke Beck
Bulk supply point
Hull West
Primary substation
Newport 1
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 1.4 MW registered
Registered capacity
1.4 MW
Change to maximum export capacity
1.4 MW
Change to maximum import capacity
4.75 MW
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
4 Jun 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
2380001557180
Last updated
5 Jul 2024
Tracked since
March 2026 edition

Change history

Found in the March 2026 edition only.

Another record at this location is on a separate page.

Changes to its status, capacity, technology or customer, newest first.

  • April 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at Creyke Beck

GSP view

69 other sites at this grid supply point in the September 2026 edition, 3 of them at Newport 1, the same primary substation. In all, the sites here total 1.9 GW: 0.6 GW connected, 1.3 GW accepted to connect.

See all 69

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose