Non Fossil Purchasing Agency

Customer named in the DNOs' registers

In UKPN's October 2026 and NGED's August 2026 editions

The registers spell this customer’s name more than one way: “Non Fossil Purchasing Agency” (6 sites), “Non Fossil Purchasing Agency Limited” (3 sites), “Non fossil purchasing agency” (1 site) and “Non fossil purchasing agency ltd” (1 site).

11sites of 1 MW and over
70.6 MWcapacity
70.6 MWconnected (11 sites)
–accepted to connect (0 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNOctober 2026 edition960.8 MW60.8 MW–
NGEDAugust 2026 edition29.8 MW9.8 MW–

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Bioenergy and waste966 MW66 MW–
Wind24.6 MW4.6 MW–

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs' latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Rainham LandfillUKPNWarleyBioenergy and wasteConnected23.22
Pitsea LandfillUKPNTilburyBioenergy and wasteConnected21
Export supplyNGEDWillenhall 132 25Kv S StnBioenergy and wasteConnected8.75
Roxwell Landfill GenerationUKPNRayleighBioenergy and wasteConnected3.5
Arlesey Landfill SiteUKPNWymondleyBioenergy and wasteConnected3
Landfill Generation Phs1UKPNBolneyBioenergy and wasteConnected3
Somerton Wind GeneratorUKPNNorwichWindConnected2.8
Swaffham 2 WindparkUKPNWalpoleWindConnected1.8
Edgefield Sand & Gravel WorksUKPNNorwichBioenergy and wasteConnected1.3
Npower Limited - Foxhall Landfill SiteUKPNBramfordBioenergy and wasteConnected1.18

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
WarleyUKPN123.2 MW–
TilburyUKPN121 MW–
Willenhall 132 25Kv S StnNGED18.8 MW–
NorwichUKPN24.1 MW–
RayleighUKPN13.5 MW–
BolneyUKPN13 MW–
WymondleyUKPN13 MW–
WalpoleUKPN11.8 MW–
BramfordUKPN11.2 MW–
Chesterfield 132Kv S StnNGED11 MW–

What changed recently

Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.

UKPN, September 2026 edition to October 2026 edition, for this customer's sites: 9 sites matched. Every September site and every October site had a match in the other edition.

NGED: QueueWatch holds one edition of its register so far, the August 2026 edition, so there is nothing to compare yet.

No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose