QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Export supply

Non fossil purchasing agency ltd at Willenhall 132 25Kv S Stn

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
10 Feb 2001
Status
Connected
Customer
Non fossil purchasing agency ltd
Site name
Export supply
Address
M E S Environmental Limited, Crown Street, Wolverhampton, West Midlands, WV1 1QB
Grid reference
Easting 391662, northing 299894
Licence area
West Midlands
Grid supply point
Willenhall 132 25Kv S Stn
Bulk supply point
Wolverhampton 132Kv S Stn
Primary substation
Not stated
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
Waste, Steam turbine (thermal power plant): 8.75 MW registered
Registered capacity
8.75 MW
Maximum export capacity
8.313 MW
Maximum import capacity
Not stated
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1424993500000
Import MPAN
Not stated
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to the details QueueWatch tracks, newest first.

Changes will show from the next edition.

Also at Willenhall 132 25Kv S Stn

GSP view

6 other sites at this grid supply point in the August 2026 edition. In all, the sites here total 96.1 MW: 46.2 MW connected, 49.9 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?