Distribution / UKPN / Grid supply point

Norwich

Grid supply point in Eastern Power Networks (EPN)

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

75sites of 1 MW and over
2.2 GWcapacity
1.1 GWconnected (53 sites)
1.1 GWaccepted to connect (22 sites)

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar40708 MW230 MW478 MW
Storage6648 MW–648 MW
Gas and other fossil12461 MW461 MW–
Wind6411 MW411 MW–
Bioenergy and waste1117.9 MW17.9 MW–

Storage capacity in MWh: no site here states any.

Each site is grouped by its first energy source, as the register names it.

How busy is each primary substation?

Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Primary substationBulk supply pointSitesConnectedAccepted to connect
Sall Grid 33kV19 MW–
Sall Grid 33kV13 MW–
Sall Grid 33kV22.7 MW–
Sall Grid 33kV11.5 MW–
Sall Grid 33kV11.1 MW–
Sall Grid 33kV959 MW45 MW
Trowse Grid 33kV13.8 MW–
Trowse Grid 33kV11.6 MW–
Trowse Grid 33kV11 MW–
Trowse Grid 33kV833 MW71 MW
GT Yarmouth Grid 33kV24.6 MW–
GT Yarmouth Grid 33kV290.8 MW–
Thorpe Grid 33kV344.6 MW–
Thorpe Grid 33kV29 MW–
Thorpe Grid 33kV16 MW–
Thorpe Grid 33kV15 MW–
Thorpe Grid 33kV34.1 MW–
Thorpe Grid 33kV315.8 MW–
Sall Grid 132/33kV1–20 MW
Sall Grid 132/33kV1–15 MW
Sall Grid 132/33kV1–30 MW
Earlham Grid 33kV26.2 MW–
Earlham Grid 33kV22.5 MW–
Earlham Grid 33kV12.2 MW–
Earlham Grid 33kV346.8 MW–
Earlham 132kV1–50 MW
Sall Grid 132kV1–50 MW
Gorleston Grid 33kV28.3 MW–
Gorleston Grid 33kV1–30 MW
Lowestoft Grid 33kV213.3 MW–
Not stated23.3 MW–
Not stated120.8 GW0.8 GW

Search and filter all 75 sites at Norwich

Not found among the sites of 1 MW and over in UKPN’s November 2026 edition

1 site last found at this grid supply point was not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode. QueueWatch keeps its page for six months and does not say whether it has left the register.

What changed recently

Changes to sites here found in both editions of each pair, newest first.

October 2026 edition to November 2026 edition: 75 sites matched. Every October site and every November site at this grid supply point had a match in the other edition.

  • (ANM) Beerhouse FarmNovember 2026 editionTarget energisation date moved from 31 Oct 2030 to 31 Dec 2031 (14 months later)
  • (ANM) Bracon AshNovember 2026 editionTarget energisation date moved from 31 Oct 2030 to 31 Dec 2031 (14 months later)
  • (ANM) Bunwell RoadNovember 2026 editionTarget energisation date moved from 31 Oct 2030 to 31 Dec 2031 (14 months later)
  • (ANM) Land East Of Drayton LaneNovember 2026 editionTarget energisation date moved from 31 Oct 2030 to 31 Dec 2031 (14 months later)
  • (ANM) Land South Of A47November 2026 editionTarget energisation date moved from 31 Oct 2030 to 31 Dec 2031 (14 months later)
  • Dereham RoadNovember 2026 editionTarget energisation date moved from 31 Oct 2030 to 31 Dec 2031 (14 months later)
  • PV Solar (Carlton Farm)October 2026 editionCapacity changed from 5.5 MW to 5 MW
  • PV Solar (Carlton Farm)October 2026 editionExport capacity changed from 5.5 MW to 5 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

How power reaches a site

A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.