QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / Sites / Customer

INTELLIGENT ALTERNATIVES LIMITED

Customer named in the DNOs’ registers

In UKPN’s November 2026 and SSEN’s November 2026 editions

The registers spell this customer’s name more than one way: “INTELLIGENT ALTERNATIVES LIMITED” (5 sites), “INTELLIGENT ALTERNATIVES” (1 site), “Intelligent Alternatives” (1 site) and “Intelligent Alternatives Limited” (1 site).

8sites of 1 MW and over
217 MWcapacity
15 MWconnected (1 site)
202 MWaccepted to connect (7 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNNovember 2026 edition2115 MW15 MW100 MW
SSENNovember 2026 edition6102 MW–102 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar8217 MW15 MW202 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
(ANM) Land At Sewardstone RoadUKPNBrimsdown (EPN)SolarAccepted to connect99.9
40MW SOLAR PVSSENCOWLEY GSPSolarAccepted to connect40
18MW SOLAR PVSSENBRAMLEY (BASI)SolarAccepted to connect18
Buntines FarmUKPNPelhamSolarConnected15
LAND AT LOCKS FARMSSENBOTLEY WOOD GSPSolarAccepted to connect12
BINDWELL LANE - PVSSENAXMINSTERSolarAccepted to connect11.7
10MW PVSSENMELKSHAM GSPSolarAccepted to connect10
BRAINS FARM CICSSENMANNINGTON GSPSolarAccepted to connect10

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
Brimsdown (EPN)UKPN1–99.9 MW
COWLEY GSPSSEN1–40 MW
BRAMLEY (BASI)SSEN1–18 MW
PelhamUKPN115 MW–
BOTLEY WOOD GSPSSEN1–12 MW
AXMINSTERSSEN1–11.7 MW
MANNINGTON GSPSSEN1–10 MW
MELKSHAM GSPSSEN1–10 MW

What changed recently

Changes to its sites found in both editions of each pair, newest first.

UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 2 sites matched. Every October site and every November site had a match in the other edition.

SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 6 sites matched. Every October site and every November site had a match in the other edition.

  • BINDWELL LANE - PVSSEN, November 2025 editionTarget energisation date moved from 6 Dec 2024 to 7 Oct 2026 (22 months later)
  • BINDWELL LANE - PVSSEN, January 2025 editionTarget energisation date stated as 6 Dec 2024 (not stated in the November 2024 edition)
  • BINDWELL LANE - PVSSEN, June 2024 editionCapacity changed from 9 MW to 11.7 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?