Distribution / SSEN / Grid supply point

BRAMLEY (BASI)

Grid supply point in Southern England (SEPD)

SSEN Embedded Capacity Register, September 2026 edition

19sites of 1 MW and over
458 MWcapacity
65 MWconnected (10 sites)
393 MWaccepted to connect (9 sites)

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar9263 MW10 MW253 MW
Storage290 MW–90 MW
Other or not stated376.4 MW26.4 MW50 MW
Gas and other fossil219.8 MW19.8 MW–
Bioenergy and waste38.8 MW8.8 MW–

Storage capacity in MWh: not published by SSEN.

Each site is grouped by its first energy source, as the register names it.

How busy is each primary substation?

Each primary substation at this grid supply point in the September 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Primary substationBulk supply pointSitesConnectedAccepted to connect
BASINGSTOKE1–41.6 MW
BASINGSTOKE39.2 MW28 MW
BASINGSTOKE1–18 MW
BASINGSTOKE116 MW–
BASINGSTOKE212.7 MW–
BASINGSTOKE25.3 MW–
BASINGSTOKE13.8 MW–
BASINGSTOKE12.9 MW–
BASINGSTOKE315 MW77 MW
Not stated4–228 MW

What changed recently

Changes to the sites here found in both of two consecutive monthly editions, the latest first.

August 2026 edition to September 2026 edition: 18 sites matched. 1 site at this grid supply point couldn't be matched between the two editions, because its details changed or it appears in only one.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

How power reaches a site

A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.