99.9MW BESS CHRISTCHURCH ROAD STORAGE
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Dec 2030
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- 99.9MW BESS CHRISTCHURCH ROAD STORAGE
- Address
- LAND TO THE SOUTH OF CHRISTCHURCH ROAD, CHRISTCHURCH ROAD WEST PARLEY, FERNDOWN, DORSET, BH22 8UB
- Grid reference
- Easting 409466, northing 98811
- Licence area
- Southern England (SEPD)
- Grid supply point
- MANNINGTON GSP
- Bulk supply point
- MANNINGTON
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 99.9 MW registered
- Registered capacity
- 99.9 MW
- Change to maximum export capacity
- 105.158 MW
- Change to maximum import capacity
- 105.158 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 3 Apr 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- May 2025 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the May 2025 edition, across 19 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2026 editionExport capacity changed from 99.9 MW to 105.158 MW
- September 2026 editionExport capacity changed from 105.158 MW to 99.9 MW
- July 2026 editionExport capacity changed from 99.9 MW to 105.158 MW
- June 2026 editionExport capacity changed from 105.158 MW to 99.9 MW
- April 2026 editionExport capacity changed from 99.9 MW to 105.158 MW
- November 2025 editionTarget energisation date stated as 30 Dec 2030 (not stated in the October 2025 edition)
Also at MANNINGTON GSP
GSP view92 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?