QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

WHITECHURCH HILL ENERGY PARK

REG WINDPOWER LTD at MANNINGTON GSP

SSEN Embedded Capacity Register, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
2 Sep 2026
Status
Accepted to connect
Customer
REG WINDPOWER LTD
Site name
WHITECHURCH HILL ENERGY PARK
Address
WHITECHURCH HILL ENERGY PARK, WINTERBORNE WHITECHURCH, BLANDFORD, DORSET, DT11 9AW
Grid reference
Easting 384345, northing 99548
Licence area
Southern England (SEPD)
Grid supply point
MANNINGTON GSP
Bulk supply point
LYTCHETT
Primary substation
LYTCHETT
Connection voltage
33 kV
Technology group
Other or not stated
Energy source 1
OTHER, OTHER: 12 MW registered
Registered capacity
12 MW
Change to maximum export capacity
12 MW
Change to maximum import capacity
3.158 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
30 Nov 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 39 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 2 Sep 2026 (not stated in the October 2025 edition)

Also at MANNINGTON GSP

GSP view

91 other sites at this grid supply point in the October 2026 edition, 1 of them at LYTCHETT, the same primary substation. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.

See all 91

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose