QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

NORTH FARM SOLAR EXTENSION LIMITED

NORTH FARM SOLAR EXTENSION LIMITED at MANNINGTON GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
NORTH FARM SOLAR EXTENSION LIMITED
Site name
Not stated
Address
LAND SOUTH SIDE OF NORTH FARM, SPETISBURY, BLANFORD, DORSET, DT11 9DH
Grid reference
Easting 389416, northing 102190
Licence area
Southern England (SEPD)
Grid supply point
MANNINGTON GSP
Bulk supply point
LYTCHETT
Primary substation
LYTCHETT
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 13.7 MW registered
Registered capacity
13.68 MW
Maximum export capacity
13.68 MW
Maximum import capacity
0.05 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000060564992
Import MPAN
Not stated
Last updated
12 Feb 2026
Tracked since
June 2025 edition

Change history

Tracked since the June 2025 edition, across 18 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at MANNINGTON GSP

GSP view

92 other sites at this grid supply point in the November 2026 edition, 1 of them at LYTCHETT, the same primary substation. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.

See all 92

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?