QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

BRILLIANT HARVEST GENERATION

CODFORD BIOGAS LTD at MANNINGTON GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
22 Feb 2016
Status
Connected
Customer
CODFORD BIOGAS LTD
Site name
BRILLIANT HARVEST GENERATION
Address
EAST FARM BRILLIANT HARVEST GENERATION, WARMINSTER, WILTSHIRE, BA12 0PJ
Grid reference
Easting 397429, northing 139768
Licence area
Southern England (SEPD)
Grid supply point
MANNINGTON GSP
Bulk supply point
SALISBURY
Primary substation
MALMPIT HILL GENERATION
Connection voltage
33 kV
Technology group
Bioenergy and waste
Energy source 1
WASTE, ENGINE (COMBUSTION / RECIPROCATING): 1.762 MW registered
Registered capacity
1.762 MW
Maximum export capacity
1.762 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000056495501
Import MPAN
2000056495496
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at MANNINGTON GSP

GSP view

92 other sites at this grid supply point in the November 2026 edition, 1 of them at MALMPIT HILL GENERATION, the same primary substation. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.

See all 92

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?