Skelton Grange
Grid supply point in Yorkshire (Northern Powergrid)
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Storage | 8 | 622 MW | 2 MW | 620 MW |
| Solar | 12 | 140 MW | 20 MW | 120 MW |
| Gas and other fossil | 14 | 113 MW | 113 MW | – |
| Bioenergy and waste | 5 | 38.2 MW | 38.2 MW | – |
| Wind | 2 | 4.5 MW | 4.5 MW | – |
| Other or not stated | 2 | 3 MW | 3 MW | – |
Storage capacity in MWh: no site here states any.
Each site is grouped by its first energy source, as the register names it.
How busy is each primary substation?
Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Primary substation | Bulk supply point | Sites | Connected | Accepted to connect | |||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mercury Renewables BESS | 1 | – | 200 MW | ||||||||||||||||||||||||||
1 site, 200 MW: 200 MW accepted to connect
| |||||||||||||||||||||||||||||
| Skelton Grange BESS | 1 | – | 99.9 MW | ||||||||||||||||||||||||||
1 site, 99.9 MW: 99.9 MW accepted to connect
| |||||||||||||||||||||||||||||
| Wakefield B BESS | 1 | – | 99.9 MW | ||||||||||||||||||||||||||
1 site, 99.9 MW: 99.9 MW accepted to connect
| |||||||||||||||||||||||||||||
| Low Farm Wakefield | 1 | – | 86 MW | ||||||||||||||||||||||||||
1 site, 86 MW: 86 MW accepted to connect
| |||||||||||||||||||||||||||||
| Staygate BESS | 1 | – | 70 MW | ||||||||||||||||||||||||||
1 site, 70 MW: 70 MW accepted to connect
| |||||||||||||||||||||||||||||
| Leeds North | 1 | – | 49.9 MW | ||||||||||||||||||||||||||
1 site, 49.9 MW: 49.9 MW accepted to connect
| |||||||||||||||||||||||||||||
| Leeds North | 1 | 2 MW | – | ||||||||||||||||||||||||||
1 site, 2 MW: 2 MW connected
| |||||||||||||||||||||||||||||
| Leeds North | 1 | 1.9 MW | – | ||||||||||||||||||||||||||
1 site, 1.9 MW: 1.9 MW connected
| |||||||||||||||||||||||||||||
| Elawan Energy BESS | 1 | – | 49.9 MW | ||||||||||||||||||||||||||
1 site, 49.9 MW: 49.9 MW accepted to connect
| |||||||||||||||||||||||||||||
| Greenfield Produce BESS | 1 | – | 49.9 MW | ||||||||||||||||||||||||||
1 site, 49.9 MW: 49.9 MW accepted to connect
| |||||||||||||||||||||||||||||
| Leeds East | 4 | 5.1 MW | 11.5 MW | ||||||||||||||||||||||||||
4 sites, 16.6 MW: 5.1 MW connected, 11.5 MW accepted to connect
| |||||||||||||||||||||||||||||
| Leeds East | 1 | 16.5 MW | – | ||||||||||||||||||||||||||
1 site, 16.5 MW: 16.5 MW connected
| |||||||||||||||||||||||||||||
| Leeds East | 2 | 10.2 MW | – | ||||||||||||||||||||||||||
2 sites, 10.2 MW: 10.2 MW connected
| |||||||||||||||||||||||||||||
| Leeds East | 1 | 4 MW | – | ||||||||||||||||||||||||||
1 site, 4 MW: 4 MW connected
| |||||||||||||||||||||||||||||
| Wakefield North | 1 | – | 20 MW | ||||||||||||||||||||||||||
1 site, 20 MW: 20 MW accepted to connect
| |||||||||||||||||||||||||||||
| Wakefield North | 4 | 11.2 MW | 2.1 MW | ||||||||||||||||||||||||||
4 sites, 13.3 MW: 11.2 MW connected, 2.1 MW accepted to connect
| |||||||||||||||||||||||||||||
| Wakefield North | 3 | 8.9 MW | – | ||||||||||||||||||||||||||
3 sites, 8.9 MW: 8.9 MW connected
| |||||||||||||||||||||||||||||
| Wakefield North | 1 | 2.5 MW | – | ||||||||||||||||||||||||||
1 site, 2.5 MW: 2.5 MW connected
| |||||||||||||||||||||||||||||
| Wakefield North | 1 | 1.5 MW | – | ||||||||||||||||||||||||||
1 site, 1.5 MW: 1.5 MW connected
| |||||||||||||||||||||||||||||
| Wakefield North | 1 | – | 1 MW | ||||||||||||||||||||||||||
1 site, 1 MW: 1 MW accepted to connect
| |||||||||||||||||||||||||||||
| South Road CHP | 1 | 45 MW | – | ||||||||||||||||||||||||||
1 site, 45 MW: 45 MW connected
| |||||||||||||||||||||||||||||
| Saint Andrews Road 132/33kV | 1 | 20 MW | – | ||||||||||||||||||||||||||
1 site, 20 MW: 20 MW connected
| |||||||||||||||||||||||||||||
| Saint Andrews Road 132/33kV | 1 | 10.6 MW | – | ||||||||||||||||||||||||||
1 site, 10.6 MW: 10.6 MW connected
| |||||||||||||||||||||||||||||
| Saint Andrews Road 132/33kV | 1 | 1 MW | – | ||||||||||||||||||||||||||
1 site, 1 MW: 1 MW connected
| |||||||||||||||||||||||||||||
| Staygate | 1 | 9.5 MW | – | ||||||||||||||||||||||||||
1 site, 9.5 MW: 9.5 MW connected
| |||||||||||||||||||||||||||||
| Staygate | 3 | 7.6 MW | – | ||||||||||||||||||||||||||
3 sites, 7.6 MW: 7.6 MW connected
| |||||||||||||||||||||||||||||
| Stourton 132/11kV | 2 | 17 MW | – | ||||||||||||||||||||||||||
2 sites, 17 MW: 17 MW connected
| |||||||||||||||||||||||||||||
| Low Road | 1 | 1.6 MW | – | ||||||||||||||||||||||||||
1 site, 1.6 MW: 1.6 MW connected
| |||||||||||||||||||||||||||||
| Low Road | 1 | 1 MW | – | ||||||||||||||||||||||||||
1 site, 1 MW: 1 MW connected
| |||||||||||||||||||||||||||||
| Low Road | 1 | 1 MW | – | ||||||||||||||||||||||||||
1 site, 1 MW: 1 MW connected
| |||||||||||||||||||||||||||||
| Station Lane | 1 | 2 MW | – | ||||||||||||||||||||||||||
1 site, 2 MW: 2 MW connected
| |||||||||||||||||||||||||||||
Not found among the sites of 1 MW and over in Northern Powergrid’s November 2026 edition
2 sites last found at this grid supply point were not found among this edition’s sites of 1 MW and over by their MPAN, grid reference or name and postcode. QueueWatch keeps their pages for six months and does not say whether they have left the register.
- Skelton Grange Road last found in the August 2026 edition
- Owlers Farm Solar Farm last found in the July 2026 edition
What changed recently
Changes to sites here found in both editions of each pair, newest first.
October 2026 edition to November 2026 edition: 43 sites matched. Every October site and every November site at this grid supply point had a match in the other edition.
No change to any detail QueueWatch tracks for these sites so far.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
How power reaches a site
A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.