Coca Cola Solar Power Plant

Coca Cola Solar Power Plant at Skelton Grange

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
Coca Cola Solar Power Plant
Site name
Coca Cola Solar Power Plant
Address
Kenmore Road, Wakefield 41 Business Park, Wakefield, West Yorkshire, WF2 0XR
Grid reference
Easting 431583, northing 424886
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Skelton Grange
Bulk supply point
Wakefield North
Primary substation
Kenmore Road
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 5 MW registered
Registered capacity
5 MW
Maximum export capacity
0 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
18 Sep 2015
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394000115753
Import MPAN
Not stated
Last updated
21 Mar 2018
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Skelton Grange

GSP view

42 other sites at this grid supply point in the November 2026 edition, 2 of them at Kenmore Road, the same primary substation. In all, the sites here total 920 MW: 180 MW connected, 740 MW accepted to connect.

  • Coca Cola Wakefield SolarCoca Cola Wakefield Solar, Solar, Kenmore Road primaryConnected2.775 MW
  • Coca-ColaCoca-Cola, Gas and other fossil, Kenmore Road primaryConnected1.169 MW
  • Mercury Renewables Leeds BESS 1Mercury Renewables Leeds BESS 1, Storage, Mercury Renewables BESS Direct primaryAccepted200 MW
  • Skelton Grange RoadSkelton Grange BESS, Storage, Skelton Grange BESS Direct primaryAccepted99.9 MW
  • Wakefield B BESSWakefield B BESS, Storage, Wakefield B BESS Direct primaryAccepted99.9 MW
  • Low Farm WakefieldLow Farm Wakefield, Solar, Low Farm Wakefield Direct primaryAccepted86 MW
  • Staygate BESSStaygate BESS, Storage, Staygate BESS Direct primaryAccepted70 MW
  • Elawan Energy BESSElawan Energy BESS, Storage, Elawan Energy BESS Direct primaryAccepted49.9 MW

See all 42

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?