2 x 2.5MW synch CHP, Arla Foods, Stourton
2 x 2.5MW synch CHP, Arla Foods, Stourton at Skelton Grange
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 31 Jan 2020
- Status
- Connected
- Customer
- 2 x 2.5MW synch CHP, Arla Foods, Stourton
- Site name
- 2 x 2.5MW synch CHP, Arla Foods, Stourton
- Address
- Pontefract Road, Hunslet, Leeds, West Yorkshire, LS10 1AX
- Grid reference
- Easting 433182, northing 430114
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Skelton Grange
- Bulk supply point
- Stourton 132/11kV
- Primary substation
- Stourton 132/11kV Direct
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Steam turbine (thermal power plant): 10 MW registered
- Registered capacity
- 10 MW
- Maximum export capacity
- 5 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 5 Dec 2018
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 2394000138779
- Import MPAN
- 2380000202960
- Last updated
- 20 Feb 2019
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Skelton Grange
GSP view41 other sites at this grid supply point in the September 2026 edition, 1 of them at Stourton 132/11kV Direct, the same primary substation. In all, the sites here total 918 MW: 180 MW connected, 738 MW accepted to connect.
- Land at Pontefract RoadLand at Pontefract Road, Gas and other fossil, Stourton 132/11kV Direct primaryConnected7 MW
- Mercury Renewables Leeds BESS 1Mercury Renewables Leeds BESS 1, Storage, Mercury Renewables BESS Direct primaryAccepted200 MW
- Greenfield Produce BESSGreenfield Produce BESS, Storage, Greenfield Produce BESS Direct primaryAccepted49.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose