New Bridge House
New Bridge House at Skelton Grange
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 21 Nov 2012
- Status
- Connected
- Customer
- New Bridge House
- Site name
- New Bridge House
- Address
- Leeds City Office Park, Holbeck, Leeds, West Yorkshire, LS11 5BD
- Grid reference
- Easting 430031, northing 432780
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Skelton Grange
- Bulk supply point
- Low Road
- Primary substation
- Brookfield Street
- Connection voltage
- 11 kV
- Technology group
- Other or not stated
- Energy source 1
- Other, Other: 1 MW registered
- Registered capacity
- 1 MW
- Maximum export capacity
- 0.105 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 2394000085123
- Import MPAN
- Not stated
- Last updated
- 8 Mar 2017
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Skelton Grange
GSP view42 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 920 MW: 180 MW connected, 740 MW accepted to connect.
- Mercury Renewables Leeds BESS 1Mercury Renewables Leeds BESS 1, Storage, Mercury Renewables BESS Direct primaryAccepted200 MW
- Greenfield Produce BESSGreenfield Produce BESS, Storage, Greenfield Produce BESS Direct primaryAccepted49.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?