Owlers Farm Solar Farm

Owlers Farm Solar Farm at Skelton Grange

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Planning consent
Granted 14 May 2026
Wakefield, reference 25/00579/FUL · Source: REPD
Customer
Owlers Farm Solar Farm
Site name
Owlers Farm Solar Farm
Address
Owlers Farm, Wakefield Road, Ossett, West Yorkshire, WF5 9JY
Grid reference
Easting 428464, northing 421218
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Skelton Grange
Bulk supply point
Wakefield North
Primary substation
Owlers Farm Solar Farm
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 20 MW registered
Registered capacity
20 MW
Change to maximum export capacity
20 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
15 Sep 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
8 May 2024
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, across 4 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Skelton Grange

GSP view

42 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 920 MW: 180 MW connected, 740 MW accepted to connect.

See all 42

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.