Mercury Renewables Leeds BESS 1

Mercury Renewables Leeds BESS 1 at Skelton Grange

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Mercury Renewables Leeds BESS 1
Site name
Mercury Renewables Leeds BESS 1
Address
Core Plant 1, Belfry Road, Leeds, West Yorkshire, LS9 0AY
Grid reference
Easting 432289, northing 432306
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Skelton Grange
Bulk supply point
Mercury Renewables BESS
Primary substation
Mercury Renewables BESS Direct
Connection voltage
132 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 200 MW registered
Registered capacity
200 MW
Change to maximum export capacity
200 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
17 Aug 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
11 Sep 2023
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Skelton Grange

GSP view

42 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 920 MW: 180 MW connected, 740 MW accepted to connect.

  • Skelton Grange RoadSkelton Grange BESS, Storage, Skelton Grange BESS Direct primaryAccepted99.9 MW
  • Wakefield B BESSWakefield B BESS, Storage, Wakefield B BESS Direct primaryAccepted99.9 MW
  • Low Farm WakefieldLow Farm Wakefield, Solar, Low Farm Wakefield Direct primaryAccepted86 MW
  • Staygate BESSStaygate BESS, Storage, Staygate BESS Direct primaryAccepted70 MW
  • Elawan Energy BESSElawan Energy BESS, Storage, Elawan Energy BESS Direct primaryAccepted49.9 MW
  • Greenfield Produce BESSGreenfield Produce BESS, Storage, Greenfield Produce BESS Direct primaryAccepted49.9 MW
  • Leeds South BESSLeeds South BESS, Storage, Leeds South BESS primaryAccepted49.9 MW
  • South Road CHPSouth Road CHP, Gas and other fossil, South Road CHP Direct primaryConnected45 MW

See all 42

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?