Renewable Energy Systems Limited
Customer named in the DNOs’ registers
In UKPN’s November 2026, NGED’s August 2026, SSEN’s November 2026 and SPEN’s September 2026 editions
The registers spell this customer’s name more than one way: “Renewable Energy Systems Limited” (5 sites), “RENEWABLE ENERGY SYSTEMS LIMITED” (3 sites), “Renewable energy systems ltd” (3 sites), “RENEWABLE ENERGY SYSTEMS LTD” (2 sites), “Renewable energy systems limited” (2 sites), “RENEWABLE ENERGY SYSTEMS LTD.” (1 site) and “Renewable Energy Systems” (1 site).
Capacity by DNO
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Wind | 10 | 307 MW | 48 MW | 259 MW |
| Storage | 3 | 242 MW | – | 242 MW |
| Solar | 3 | 132 MW | – | 132 MW |
| Other or not stated | 1 | 62.5 MW | – | 62.5 MW |
Each site is grouped by its first energy source, as the register names it.
Sites
Each site under this name in the DNOs’ latest editions, the largest first.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
Grid supply points
Each grid supply point its sites are at, with the capacity of its own sites there.
| Grid supply point | DNO | Sites | Connected | Accepted to connect |
|---|---|---|---|---|
| BERRYBURN GRID | SSEN | 2 | – | 166 MW |
| Ratcliffe On Soar 132Kv S Stn | NGED | 2 | – | 161 MW |
| BRIDGE OF DUN | SSEN | 1 | – | 76.2 MW |
| Ayr | SPEN | 1 | – | 66 MW |
| West Burton 132Kv S Stn | NGED | 1 | – | 53.1 MW |
| COWLEY GSP | SSEN | 1 | – | 50 MW |
| THURSO | SSEN | 1 | – | 46 MW |
| KEITH | SSEN | 1 | – | 36 MW |
| Saltcoats B | SPEN | 2 | 28 MW | – |
| Swansea North Grid | NGED | 2 | 5.5 MW | 20 MW |
| Pelham | UKPN | 1 | – | 20 MW |
| Crookston B | SPEN | 1 | 10 MW | – |
| Trawsfynydd | SPEN | 1 | 4.5 MW | – |
What changed recently
Changes to its sites found in both editions of each pair, newest first.
UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 1 site matched. Every October site and every November site had a match in the other edition.
Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.
SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 6 sites matched. Every October site and every November site had a match in the other edition.
SPEN, August 2026 edition to September 2026 edition, for this customer’s sites: 5 sites matched. Every August site and every September site had a match in the other edition.
- Holmston Farm (Previously Broomfield Lodge)SPEN, September 2026 editionTarget energisation date moved from 26 Aug 2026 to 21 Sep 2026 (1 month later)
- Holmston Farm (Previously Broomfield Lodge)SPEN, August 2026 editionTarget energisation date moved from 24 Aug 2026 to 26 Aug 2026 (2 days later)
- Holmston Farm (Previously Broomfield Lodge)SPEN, May 2026 editionTarget energisation date moved from 4 Aug 2026 to 24 Aug 2026 (1 month later)
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?