QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / NGED / Grid supply point

Swansea North Grid

Grid supply point in South Wales

NGED Embedded Capacity Register, August 2026 edition

87sites of 1 MW and over
1.2 GWcapacity
0.6 GWconnected (61 sites)
0.6 GWaccepted to connect (26 sites)

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar48516 MW248 MW268 MW
Wind19385 MW223 MW162 MW
Hydro and marine3116 MW7 MW109 MW
Storage499.1 MW74.4 MW24.7 MW
Gas and other fossil782.7 MW62.7 MW20 MW
Bioenergy and waste319.7 MW4.7 MW15 MW
Other or not stated311.4 MW11.4 MW–

Storage capacity in MWh: not published by NGED.

Each site is grouped by its first energy source, as the register names it.

How busy is each primary substation?

Each primary substation at this grid supply point in the August 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Primary substationBulk supply pointSitesConnectedAccepted to connect
Swansea North Bsp1264 MW129 MW
Rhos Grid24.3 MW–
Rhos Grid12 MW–
Rhos Grid541 MW109 MW
Hirwaun Grid316.6 MW15 MW
Hirwaun Grid24.4 MW–
Hirwaun Grid562.8 MW14.1 MW
Trostre Grid21.1 MW26 MW
Trostre Grid110 MW–
Trostre Grid627.3 MW44.7 MW
Briton Ferry Grid13.1 MW–
Briton Ferry Grid10.3 MW–
Briton Ferry Grid664.2 MW26 MW
Ammanford Grid11 MW–
Ammanford Grid791.6 MW–
Ystradgynlais Grid715.3 MW40.3 MW
Lampeter Grid110.3 MW–
Lampeter Grid1–5 MW
Lampeter Grid13.5 MW–
Lampeter Grid34.2 MW28.9 MW
Tir John Power Station1–2.5 MW
Tir John Power Station11 MW–
Tir John Power Station233.3 MW–
Carmarthen Grid1–9.9 MW
Carmarthen Grid414.1 MW9.8 MW
Llanarth Grid1–17.5 MW
Swansea West Grid11.2 MW–
Swansea West Grid14 MW–
Not stated7151 MW120 MW

Search and filter all 87 sites at Swansea North Grid

What changed recently

Changes to sites here found in both editions of each pair, newest first.

Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

How power reaches a site

A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.