CAIRN DUHIE WIND FARM
RENEWABLE ENERGY SYSTEMS LIMITED at BERRYBURN GRID
SSEN Embedded Capacity Register, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2027
- Status
- Accepted to connect
- Customer
- RENEWABLE ENERGY SYSTEMS LIMITED
- Site name
- CAIRN DUHIE WIND FARM
- Address
- CAIRN DUHIE WIND FARM, LAND SOUTHWEST OF FERNESS,, NAIRN, HIGHLAND, IV12 5XB
- Grid reference
- Easting 297902, northing 845725
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- BERRYBURN GRID
- Bulk supply point
- Not stated
- Primary substation
- BERRYBURN GRID
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 103.5 MW registered
- Energy source 2
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 67.2 MW registered
- Registered capacity
- 103.5 MW
- Change to maximum export capacity
- 67.2 MW
- Change to maximum import capacity
- 36.3 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 20 Jan 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 37 editions. Not found at 1 MW or over in the December 2024 and January 2025 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2025 editionTarget energisation date stated as 31 Oct 2027 (not stated in the October 2025 edition)
- January 2025 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
- December 2024 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
Also at BERRYBURN GRID
GSP view5 other sites at this grid supply point in the October 2026 edition, 5 of them at BERRYBURN GRID, the same primary substation. In all, the sites here total 324 MW: 95 MW connected, 229 MW accepted to connect.
- CORSHELLACH BESSRENEWABLE ENERGY SYSTEMS LTD, Other or not stated, BERRYBURN GRID primaryAccepted62.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose