Holmston Farm (Previously Broomfield Lodge)

Renewable Energy Systems Limited at Ayr

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
21 Sep 2026
Status
Accepted to connect
Customer
Renewable Energy Systems Limited
Site name
Holmston Farm (Previously Broomfield Lodge)
Address
Holmston Farm, Broomfield Road, Ayr, South Ayrshire, KA7 2SP
Grid reference
Easting 237720, northing 620635
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Ayr
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy, Storage - Electrochemical (Batteries): 66 MW registered
Registered capacity
66 MW
Change to maximum export capacity
49.9 MW
Change to maximum import capacity
49.9 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
24 May 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
SPT-RI-003, SPT-RI-1796, SPT-RI-1873, SPT-RI-200, SPT-RI-2073, SPT-RI-2083, SPT-RI-2084, SPT-RI-2085, SPT-RI-231, SPT-RI-284, SPT-RI-2862, SPT-RI-2876, SPT-RI-2877, SPT-RI-2943, SPT-RI-3002, SPT-RI-3029, SPT-RI-3159, SPT-RI-3309, SPT-RI-3315, SPT-RI-3498, SPT-RI-3884, SPT-RI-4385
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
27 Oct 2022
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

  • September 2026 edition
    Target energisation date moved from 26 Aug 2026 to 21 Sep 2026 (1 month later)
  • August 2026 edition
    Target energisation date moved from 24 Aug 2026 to 26 Aug 2026 (2 days later)
  • May 2026 edition
    Target energisation date moved from 4 Aug 2026 to 24 Aug 2026 (1 month later)

Also at Ayr

GSP view

2 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 256 MW: 256 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?