Ilos new energy uk limited

Customer named in the DNOs' registers

In UKPN's October 2026 and NGED's August 2026 editions

The registers spell this customer’s name more than one way: “Ilos new energy uk limited” (8 sites), “Ilos new energy uk ltd” (7 sites), “Ilos New Energy UK Limited” (3 sites) and “ilos new energy uk ltd” (1 site).

19sites of 1 MW and over
367 MWcapacity
–connected (0 sites)
367 MWaccepted to connect (19 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNOctober 2026 edition350 MW–50 MW
NGEDAugust 2026 edition16317 MW–317 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar19367 MW–367 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs' latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Neuadd farmNGEDRassau GspSolarAccepted to connect49.9
Thingehill courtNGEDBishops Wood 132Kv S StnSolarAccepted to connect36
Land east sideNGEDBishops Wood 132Kv S StnSolarAccepted to connect30
Tyr-gelli farmNGEDUpper BoatSolarAccepted to connect30
Ratherton farmNGEDAlverdiscott SgpSolarAccepted to connect25
Land at stokesayNGEDBishops Wood 132Kv S StnSolarAccepted to connect20
Coedmoelion farmNGEDSwansea North GridSolarAccepted to connect19.95
Land On The West Side Of Selling RoadUKPNKemsleySolarAccepted to connect18
Stable yard, 18mw pvNGEDGrendon 132Kv S StnSolarAccepted to connect18
Land at lower meadowley farmNGEDIronbridge 132Kv S StnSolarAccepted to connect17.1

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
Bishops Wood 132Kv S StnNGED4–95.9 MW
Rassau GspNGED1–49.9 MW
Upper BoatNGED2–41 MW
KemsleyUKPN2–35 MW
Swansea North GridNGED2–29.8 MW
Alverdiscott SgpNGED1–25 MW
Grendon 132Kv S StnNGED1–18 MW
Ironbridge 132Kv S StnNGED1–17.1 MW
Axminster SgpNGED1–15 MW
BolneyUKPN1–15 MW

What changed recently

Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.

UKPN, September 2026 edition to October 2026 edition, for this customer's sites: 3 sites matched. Every September site and every October site had a match in the other edition.

NGED: QueueWatch holds one edition of its register so far, the August 2026 edition, so there is nothing to compare yet.

No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose