CLP Envirogas Limited

Customer named in the DNOs’ registers

In UKPN’s November 2026, NGED’s August 2026, SPEN’s September 2026 and ENWL’s October 2026 editions

The registers spell this customer’s name more than one way: “CLP Envirogas Limited” (4 sites), “CLP ENVIROGAS LIMITED” (3 sites), “Clp envirogas ltd” (3 sites), “CLp Envirogas Limited” (1 site) and “Clp envirogas” (1 site).

12sites of 1 MW and over
30 MWcapacity
30 MWconnected (12 sites)
–accepted to connect (0 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNNovember 2026 edition11 MW1 MW–
NGEDAugust 2026 edition410.3 MW10.3 MW–
SPENSeptember 2026 edition413 MW13 MW–
ENWLOctober 2026 edition35.7 MW5.7 MW–

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Bioenergy and waste1127.9 MW27.9 MW–
Other or not stated12.1 MW2.1 MW–

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Cotesbach landfill generationNGEDCoventry 132Kv S StnBioenergy and wasteConnected5.1
Garlaff LandfillSPENCoyltonBioenergy and wasteConnected4.6
Cathkin LandfillSPENEast Kilbride SouthBioenergy and wasteConnected4.2
GRAPHITE WAYENWLPADIHAM GSPBioenergy and wasteConnected3.375
Cathkin Landfill ExtensionSPENWestburn RoadBioenergy and wasteConnected3.2
Cotesbach landfill generationNGEDCoventry 132Kv S StnOther or not statedConnected2.1
Walleys quarry landfill siteNGEDCellarhead 132KvBioenergy and wasteConnected2
JAMESON ROADENWLPENWORTHAM WEST GSP / STANAH GSP GROUPBioenergy and wasteConnected1.3
Plymouth chelson meadow landfill import/export (clp envirogas)NGEDAbham SgpBioenergy and wasteConnected1.05
ROWLEY III LANDFILL SITEENWLROCHDALE SGTS 2 3 4Bioenergy and wasteConnected1.03

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
Coventry 132Kv S StnNGED27.2 MW–
CoyltonSPEN14.6 MW–
East Kilbride SouthSPEN14.2 MW–
PADIHAM GSPENWL13.4 MW–
Westburn RoadSPEN13.2 MW–
Cellarhead 132KvNGED12 MW–
PENWORTHAM WEST GSP / STANAH GSP GROUPENWL11.3 MW–
Abham SgpNGED11.1 MW–
ROCHDALE SGTS 2 3 4ENWL11 MW–
Rye HouseUKPN11 MW–

What changed recently

Changes to its sites found in both editions of each pair, newest first.

UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 1 site matched. Every October site and every November site had a match in the other edition.

Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.

SPEN, August 2026 edition to September 2026 edition, for this customer’s sites: 4 sites matched. Every August site and every September site had a match in the other edition.

ENWL, September 2026 edition to October 2026 edition, for this customer’s sites: 3 sites matched. Every September site and every October site had a match in the other edition.

No change to any detail QueueWatch tracks for its sites so far.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?