Cathkin Landfill
CLP Envirogas Limited at East Kilbride South
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 15 Dec 2005
- Status
- Connected
- Customer
- CLP Envirogas Limited
- Site name
- Cathkin Landfill
- Address
- Cathkin Landfill Gas Power Generation, Cairnmuir Road, East Kilbride, South Lanarkshire, G73 4PY
- Grid reference
- Easting 262500, northing 657500
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- East Kilbride South
- Bulk supply point
- Not stated
- Primary substation
- COMMON FARM (11kV)
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Landfill gas, Steam-gas turbine (CCGT): 4.2 MW registered
- Registered capacity
- 4.2 MW
- Maximum export capacity
- 4.2 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1800053802415
- Import MPAN
- 1800053802406
- Last updated
- 14 Sep 2020
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at East Kilbride South
GSP view13 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 305 MW: 133 MW connected, 172 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose