JBM SOLAR PROJECTS 18 LTD
JBM SOLAR PROJECTS 18 LTD at BRAMLEY (FLEE)
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 28 Apr 2025
- Status
- Connected
- Customer
- JBM SOLAR PROJECTS 18 LTD
- Site name
- Not stated
- Address
- BUNKERS HILL SOLAR A, HAMPSHIRE INDUSTRIAL BUSINESS PARK, BASINGSTOKE, HAMPSHIRE, RG27 9DA
- Grid reference
- Easting 472871, northing 156121
- Licence area
- Southern England (SEPD)
- Grid supply point
- BRAMLEY (FLEE)
- Bulk supply point
- COXMOOR WOOD
- Primary substation
- HOOK
- Connection voltage
- 132 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 49.9 MW registered
- Registered capacity
- 49.9 MW
- Maximum export capacity
- 49.9 MW
- Maximum import capacity
- 38 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 2000060864741
- Import MPAN
- 2000060864732
- Last updated
- 12 Feb 2026
- Tracked since
- August 2025 edition
Change history
Tracked since the August 2025 edition, across 16 editions.
Changes to the details QueueWatch tracks, newest first.
- October 2025 editionStatus changed from “accepted to connect” to “connected”
- October 2025 editionCustomer changed from AMBERSIDE ENERGY LTD to JBM SOLAR PROJECTS 18 LTD
Also at BRAMLEY (FLEE)
GSP view67 other sites at this grid supply point in the November 2026 edition, 1 of them at HOOK, the same primary substation. In all, the sites here total 1.6 GW: 0.4 GW connected, 1.2 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?