ELECTROROUTE ENERGY TRADING LIMITED
ELECTROROUTE ENERGY TRADING LIMITED at BRAMLEY (FLEE)
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- ELECTROROUTE ENERGY TRADING LIMITED
- Site name
- Not stated
- Address
- PRESTON FARM, PRESTON CANDOVER, BASINGSTOKE, HAMPSHIRE, RG25 2DS
- Grid reference
- Easting 460863, northing 142227
- Licence area
- Southern England (SEPD)
- Grid supply point
- BRAMLEY (FLEE)
- Bulk supply point
- FERNHURST
- Primary substation
- PRESTON CANDOVER
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 20.425 MW registered
- Registered capacity
- 20.425 MW
- Maximum export capacity
- 20.425 MW
- Maximum import capacity
- 0.428 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 2000060635241
- Import MPAN
- 2000060635232
- Last updated
- 12 Feb 2026
- Tracked since
- October 2025 edition
Change history
Tracked since the October 2025 edition, across 12 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at BRAMLEY (FLEE)
GSP view67 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.6 GW: 0.4 GW connected, 1.2 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose