QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

ELECTROROUTE ENERGY TRADING LIMITED

ELECTROROUTE ENERGY TRADING LIMITED at BRAMLEY (FLEE)

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
ELECTROROUTE ENERGY TRADING LIMITED
Site name
Not stated
Address
PRESTON FARM, PRESTON CANDOVER, BASINGSTOKE, HAMPSHIRE, RG25 2DS
Grid reference
Easting 460863, northing 142227
Licence area
Southern England (SEPD)
Grid supply point
BRAMLEY (FLEE)
Bulk supply point
FERNHURST
Primary substation
PRESTON CANDOVER
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 20.425 MW registered
Registered capacity
20.425 MW
Maximum export capacity
20.425 MW
Maximum import capacity
0.428 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000060635241
Import MPAN
2000060635232
Last updated
12 Feb 2026
Tracked since
October 2025 edition

Change history

Tracked since the October 2025 edition, across 12 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at BRAMLEY (FLEE)

GSP view

67 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.6 GW: 0.4 GW connected, 1.2 GW accepted to connect.

See all 67

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose