QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

SWECO UK LTD

SWECO UK LTD at BRAMLEY (FLEE)

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
7 Dec 2028
Status
Accepted to connect
Customer
SWECO UK LTD
Site name
Not stated
Address
BLUE BELL LODGE, FARNHAM, SURREY, GU10 5DE
Grid reference
Easting 478592, northing 150672
Licence area
Southern England (SEPD)
Grid supply point
BRAMLEY (FLEE)
Bulk supply point
Not stated
Primary substation
FLEET
Connection voltage
132 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 105.6 MW registered
Registered capacity
105.6 MW
Change to maximum export capacity
105.6 MW
Change to maximum import capacity
104.211 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
16 Jun 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Jul 2026
Tracked since
July 2026 edition

Change history

Tracked since the July 2026 edition, across 3 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at BRAMLEY (FLEE)

GSP view

67 other sites at this grid supply point in the September 2026 edition, 1 of them at FLEET, the same primary substation. In all, the sites here total 1.6 GW: 0.4 GW connected, 1.2 GW accepted to connect.

See all 67

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose