Distribution / Northern Powergrid / Grid supply point

West Melton / Thorpe Marsh

Grid supply point in Yorkshire (Northern Powergrid)

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Northern Powergrid’s register names more than one grid supply point here, as one. QueueWatch keeps them together, as the register gives them, and does not split their sites between them.

49sites of 1 MW and over
1.2 GWcapacity
0.3 GWconnected (32 sites)
0.9 GWaccepted to connect (17 sites)

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar17524 MW18 MW506 MW
Storage9424 MW20 MW404 MW
Bioenergy and waste13120 MW90 MW30 MW
Gas and other fossil765.2 MW65.2 MW–
Wind360.2 MW60.2 MW–

Storage capacity: 2 sites here state 519 MWh, 519 MWh accepted to connect.

Each site is grouped by its first energy source, as the register names it.

How busy is each primary substation?

Each primary substation at this grid supply point in the November 2026 edition, under the bulk supply point its register gives. Select a row to see its sites.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Primary substationBulk supply pointSitesConnectedAccepted to connect
Doncaster B/Thorpe Marsh1–180 MW
Doncaster B/Thorpe Marsh1–89.9 MW
Doncaster B/Thorpe Marsh1–62.5 MW
Doncaster B/Thorpe Marsh144 MW–
Doncaster B/Thorpe Marsh1–40 MW
Doncaster B/Thorpe Marsh1–30 MW
Doncaster B/Thorpe Marsh119 MW–
Doncaster B/Thorpe Marsh1–15 MW
Doncaster B/Thorpe Marsh18.2 MW–
Doncaster B/Thorpe Marsh18 MW–
Doncaster B/Thorpe Marsh36.3 MW–
Doncaster B/Thorpe Marsh15.1 MW–
Doncaster B/Thorpe Marsh15 MW–
Doncaster B/Thorpe Marsh25 MW–
Doncaster B/Thorpe Marsh15 MW–
Doncaster B/Thorpe Marsh13.8 MW–
Doncaster B/Thorpe Marsh13.8 MW–
Doncaster B/Thorpe Marsh23.7 MW–
Doncaster B/Thorpe Marsh13.6 MW–
Doncaster B/Thorpe Marsh12.9 MW–
Doncaster B/Thorpe Marsh12.3 MW–
Doncaster B/Thorpe Marsh22.2 MW–
Doncaster B/Thorpe Marsh1–2 MW
Loversall Hybrid1–200 MW
West Melton Station PV1–120 MW
Mallard Way240 MW–
Mallard Way220 MW16.5 MW
Mallard Way120 MW–
Mallard Way1–8 MW
Mallard Way1–3 MW
Attercliffe1–40 MW
Attercliffe119.3 MW–
Nel Cutts BESS1–50 MW
Darnell Road BESS1–40 MW
Doncaster Central1–40 MW
Blackburn Meadows B213.2 MW–
Blackburn Meadows B22 MW3.1 MW
Blackburn Meadows B12.1 MW–
Blackburn Meadows B11.2 MW–
Park Street18 MW–

Search and filter all 49 sites at West Melton / Thorpe Marsh

Not found among the sites of 1 MW and over in Northern Powergrid’s November 2026 edition

4 sites last found at this grid supply point were not found among this edition’s sites of 1 MW and over by their MPAN, grid reference or name and postcode. QueueWatch keeps their pages for six months and does not say whether they have left the register.

What changed recently

Changes to sites here found in both editions of each pair, newest first.

October 2026 edition to November 2026 edition: 49 sites matched. 1 site at this grid supply point couldn’t be matched between the two editions, because its details changed or it appears in only one.

1 site without a match in the other edition
In the October 2026 edition only (1)
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

How power reaches a site

A grid supply point (GSP) is where the national grid hands power to the local network. A bulk supply point (BSP) steps it down to a lower voltage for an area. A primary substation steps it down again for the streets and sites nearby. Most small and medium sites connect at a primary. Not every network has all three levels.