Mill Close Hybrid
Mill Close Hybrid at West Melton / Thorpe Marsh
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 6 Sep 2024
- Status
- Connected
- Customer
- Mill Close Hybrid
- Site name
- Mill Close Hybrid
- Address
- Mill Close, Rotherham, Rotherham, South Yorkshire, S60 1BZ
- Grid reference
- Easting 442133, northing 391837
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- West Melton / Thorpe Marsh
- Bulk supply point
- Blackburn Meadows B
- Primary substation
- Templeborough 33/11kV
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 0.92 MW registered
- Energy source 2
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 1.2 MW registered
- Registered capacity
- 2.12 MW
- Maximum export capacity
- 2.12 MW
- Maximum import capacity
- 1.425 MW
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 11 Mar 2022
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 2394200295240
- Import MPAN
- 2380002896630
- Last updated
- 19 Dec 2024
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at West Melton / Thorpe Marsh
GSP view48 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.2 GW: 0.3 GW connected, 0.9 GW accepted to connect.
- West Melton Station PVWest Melton Station PV, Solar, West Melton Station PV Direct primaryAccepted120 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?