QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Balby Carr Bank

Balby Carr Bank at West Melton / Thorpe Marsh

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Jun 2018
Status
Connected
Customer
Balby Carr Bank
Site name
Balby Carr Bank
Address
Balby Carr Bank, Mallard Way, Doncaster, South Yorkshire, DN4 8DE
Grid reference
Easting 457849, northing 401122
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
West Melton / Thorpe Marsh
Bulk supply point
Mallard Way
Primary substation
Balby Generation
Connection voltage
33 kV
Technology group
Bioenergy and waste
Energy source 1
Waste, Gas turbine (OCGT): 20 MW registered
Registered capacity
20 MW
Maximum export capacity
10 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
27 Jul 2017
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394200144124
Import MPAN
2380002660393
Last updated
3 Aug 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at West Melton / Thorpe Marsh

GSP view

48 other sites at this grid supply point in the November 2026 edition, 1 of them at Balby Generation, the same primary substation. In all, the sites here total 1.2 GW: 0.3 GW connected, 0.9 GW accepted to connect.

See all 48

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?