Bootham Lane Landfill Site
Bootham Lane Landfill Site at West Melton / Thorpe Marsh
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 2 May 2001
- Status
- Connected
- Customer
- Bootham Lane Landfill Site
- Site name
- Bootham Lane Landfill Site
- Address
- Bootham Lane Landfill Site, Stainforth, Doncaster, South Yorkshire, DN7 4JT
- Grid reference
- Easting 465510, northing 410242
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- West Melton / Thorpe Marsh
- Bulk supply point
- Doncaster B/Thorpe Marsh
- Primary substation
- Stainforth
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Waste, Gas turbine (OCGT): 2.28 MW registered
- Registered capacity
- 2.28 MW
- Maximum export capacity
- 0.855 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 2300000846014
- Import MPAN
- 2300000846005
- Last updated
- 8 Mar 2017
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at West Melton / Thorpe Marsh
GSP view48 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.3 GW: 0.3 GW connected, 1 GW accepted to connect.
- West Melton Station PVWest Melton Station PV, Solar, West Melton Station PV Direct primaryAccepted120 MW
- Holme Wood Lane Solar and BESSNew Holme Wood Lane Solar and BESS, Solar, New Holme Wood Lane Solar & BESS primaryAccepted84 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose