Hooton Pagnell Hybrid

Hooton Pagnell Hybrid at West Melton / Thorpe Marsh

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Hooton Pagnell Hybrid
Site name
Hooton Pagnell Hybrid
Address
Land at Hooton Pagnell Hall, Hooton Pagnell, Doncaster, South Yorkshire, DN5 7BW
Grid reference
Easting 448504, northing 408130
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
West Melton / Thorpe Marsh
Bulk supply point
Doncaster B/Thorpe Marsh
Primary substation
Hooton Pagnell Hybrid
Connection voltage
66 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 30.5 MW registered
Energy source 2
Solar, Photovoltaic: 15.625 MW registered
Energy source 3
Wind, Onshore wind turbines: 15.625 MW registered
Registered capacity
62.5 MW
Change to maximum export capacity
62.5 MW
Change to maximum import capacity
30.495 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
3 Nov 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
19 Dec 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at West Melton / Thorpe Marsh

GSP view

48 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.3 GW: 0.3 GW connected, 1 GW accepted to connect.

See all 48

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose