Transmission / Projects / England and Wales
Abergelli Power Limited
- Connection date
- Left 28 Nov 2023
- Gate
- Not stated
- Status
- Consents Approved
- Technology
- Gas (OCGT)
- Total capacity
- 299 MW
- Connected now
- 0 MW
- Still to connect
- 299 MW
- Transmission owner
- National Grid Electricity Transmission (NGET)
- Agreement type
- Directly Connected
- Region
- England and Wales
- Project number
- PRO-000371
- In the register since
- January 2021 or earlier
Change history
Every change to this project across 146 registers from 29 Jan 2021 to 20 Oct 2026.
- 28 Nov 2023 registerLeft the register (299 MW from 29 Sep 2025)
- 23 Dec 2022 registerSubstation name updated in the register (from Swansea North 400kV to Swansea North 400kV Substation)
- 30 Sep 2022 registerConnection date moved from 30 Sep 2022 to 29 Sep 2025 (+36 months)
- 30 Sep 2022 registerStatus changed from Scoping to Consents Approved
Also at Swansea North 400kV Substation
Substation view8 other projects, 2 GW still to connect at this substation in total.
- Swansea Greener Grid Park - Connection 1SWANSEA GRID SOLUTIONS LIMITED, Storage, Not statedAug 202497 MW
- Swansea Greener Grid Park - Connection 2SWANSEA GRID SOLUTIONS LIMITED, Other, Not statedJul 20250 MW
- Swansea NorthEDF ENERGY RENEWABLES LIMITED, Storage, Gate 1Jul 202849.9 MW
- Swansea North Green Energy CentreSWANSEA NORTH GREEN NG LIMITED, Storage with solar or wind, Not statedOct 20281 GW
- BESS SwanREWE 3 LIMITED, Storage, Not statedOct 2028200 MW
- Hirfynydd and Mynydd DrumaurEDF ENERGY RENEWABLES LIMITED, Storage with solar or wind, Gate 1Oct 2030249 MW
- SwanseaENSO GREEN HOLDINGS LIMITED, Storage with solar or wind, Gate 1Oct 2032400 MW
- Peak Gen LlandarcyPEAK GEN POWER 5 LIMITED, Thermal (gas, biomass, waste), Not statedConnected21 MW