Abbey Mills Pumping Station

Thames Water Utilities Limited at West Ham

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Jan 2006
Status
Connected
Customer
Thames Water Utilities Limited
Site name
Abbey Mills Pumping Station
Address
Abbey Lane, Stratford, London, E15 2RW
Grid reference
Easting 538761, northing 183180
Licence area
London Power Networks (LPN)
Grid supply point
West Ham
Bulk supply point
Not stated
Primary substation
West Ham Grid 11kV
Connection voltage
Not stated
Technology group
Gas and other fossil
Energy source 1
Fossil - Oil, Engine (combustion / reciprocating): 4 MW registered
Registered capacity
4 MW
Maximum export capacity
4 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
1200060934011
Import MPAN
Not stated
Last updated
14 Dec 2021
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at West Ham

GSP view

10 other sites at this grid supply point in the October 2026 edition, 1 of them at West Ham Grid 11kV, the same primary substation. In all, the sites here total 29.5 MW: 26.5 MW connected, 3 MW accepted to connect.

  • BywatersBywaters, Solar, West Ham Grid 11kV primaryConnected1 MW
  • Riverside SouthHurley Palmer Flatt Limited, Gas and other fossil, West Ferry Circus 11kV primaryConnected5.7 MW
  • Thames RefineryTate & Lyle, Gas and other fossil, Silvertown B 11kV primaryConnected5.5 MW
  • 5 North ColonnadeBarclays Capital, Gas and other fossil, Simpsons Road 11kV primaryConnected4.4 MW
  • Greenwich Peninsula Energy CentreGreenwich Peninsula Energy Centre, Gas and other fossil, Old School Close 11kV primaryConnected1.99 MW
  • Land At London'S Excel CentreNet Zero Marine Services Limited, Storage, Silvertown B 11kV primaryAccepted1.5 MW
  • London Royal DocksThames Marine Service Limited, Solar, Silvertown B 11kV primaryAccepted1.5 MW
  • North Woolwich RoadMinoco Royal Wharf Energy Centre, Gas and other fossil, Silvertown B 11kV primaryConnected1.4 MW

See all 10

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose