Bywaters
Bywaters at West Ham
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 22 Dec 2015
- Status
- Connected
- Planning consent
- Granted 18 Dec 2015
Newham, reference 15/02981/PREPV · Source: REPD - Customer
- Bywaters
- Site name
- Bywaters
- Address
- Twelvetrees Crescent, Bow, London, E3 3JG
- Grid reference
- Easting 538587, northing 182160
- Licence area
- London Power Networks (LPN)
- Grid supply point
- West Ham
- Bulk supply point
- Not stated
- Primary substation
- West Ham Grid 11kV
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 1 MW registered
- Registered capacity
- 1 MW
- Maximum export capacity
- 1 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1200061837995
- Import MPAN
- Not stated
- Last updated
- 13 Nov 2020
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at West Ham
GSP view9 other sites at this grid supply point in the November 2026 edition, 1 of them at West Ham Grid 11kV, the same primary substation. In all, the sites here total 28.3 MW: 25.3 MW connected, 3 MW accepted to connect.
- Abbey Mills Pumping StationThames Water Utilities Limited, Gas and other fossil, West Ham Grid 11kV primaryConnected4 MW
- Riverside SouthHurley Palmer Flatt Limited, Gas and other fossil, West Ferry Circus 11kV primaryConnected5.7 MW
- Greenwich Peninsula Energy CentreGreenwich Peninsula Energy Centre, Gas and other fossil, Old School Close 11kV primaryConnected1.99 MW
- Land At London'S Excel CentreNet Zero Marine Services Limited, Storage, Silvertown B 11kV primaryAccepted1.5 MW
- North Woolwich RoadMinoco Royal Wharf Energy Centre, Gas and other fossil, Silvertown B 11kV primaryConnected1.4 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.