London Royal Docks
Thames Marine Service Limited at West Ham
UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- Thames Marine Service Limited
- Site name
- London Royal Docks
- Address
- Victoria Docks, London, E16 2GH
- Grid reference
- Easting 543693, northing 180676
- Licence area
- London Power Networks (LPN)
- Grid supply point
- West Ham
- Bulk supply point
- West Ham 66kV
- Primary substation
- Silvertown B 11kV
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 1.5 MW registered
- Energy source 2
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 1.5 MW registered
- Registered capacity
- 1.5 MW
- Change to maximum export capacity
- 1.5 MW
- Change to maximum import capacity
- 1.5 MW
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- 11 Aug 2021
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not published by UKPN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Aug 2023
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at West Ham
GSP view10 other sites at this grid supply point in the October 2026 edition, 3 of them at Silvertown B 11kV, the same primary substation. In all, the sites here total 29.5 MW: 26.5 MW connected, 3 MW accepted to connect.
- Land At London'S Excel CentreNet Zero Marine Services Limited, Storage, Silvertown B 11kV primaryAccepted1.5 MW
- North Woolwich RoadMinoco Royal Wharf Energy Centre, Gas and other fossil, Silvertown B 11kV primaryConnected1.4 MW
- Riverside SouthHurley Palmer Flatt Limited, Gas and other fossil, West Ferry Circus 11kV primaryConnected5.7 MW
- Abbey Mills Pumping StationThames Water Utilities Limited, Gas and other fossil, West Ham Grid 11kV primaryConnected4 MW
- Greenwich Peninsula Energy CentreGreenwich Peninsula Energy Centre, Gas and other fossil, Old School Close 11kV primaryConnected1.99 MW
- Barkantine CHPLondon Electricity Services, Gas and other fossil, West Ferry Circus 11kV primaryConnected1.34 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose