QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / Sites / Customer

Thames Water Utilities Limited

Customer named in the DNOs’ registers

In UKPN’s November 2026 and SSEN’s November 2026 editions

The registers spell this customer’s name more than one way: “Thames Water Utilities Limited” (5 sites), “THAMES WATER UTILITIES LIMITED” (2 sites), “THAMES WATER UTILITIES LTD” (1 site) and “Thames Water Utilities” (1 site).

9sites of 1 MW and over
36.6 MWcapacity
35.1 MWconnected (8 sites)
1.5 MWaccepted to connect (1 site)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNNovember 2026 edition629.1 MW29.1 MW–
SSENNovember 2026 edition37.5 MW6 MW1.5 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Gas and other fossil425.5 MW25.5 MW–
Solar26.3 MW4.8 MW1.5 MW
Bioenergy and waste34.8 MW4.8 MW–

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Mogden StwUKPNLalehamGas and other fossilConnected18
ASHFORD COMMONSSENLALEHAMSolarConnected4.75
Abbey Mills Pumping StationUKPNWest HamGas and other fossilConnected4
Beddington Sewage WorksUKPNBeddington 132kVGas and other fossilConnected2
LongreachUKPNLittlebrook 132kV (SPN)Bioenergy and wasteConnected2
Rye Meads STWUKPNRye HouseBioenergy and wasteConnected1.6
LITTLE MARLOW TWUL PVSSENAMERSHAMSolarAccepted to connect1.5
Shalford Water Treatment WorksUKPNWest WeybridgeGas and other fossilConnected1.5
IVERZDATA NOT AVAILABLEZZSSENIVER 132KVBioenergy and wasteConnected1.2

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
LalehamUKPN118 MW–
LALEHAMSSEN14.8 MW–
West HamUKPN14 MW–
Beddington 132kVUKPN12 MW–
Littlebrook 132kV (SPN)UKPN12 MW–
Rye HouseUKPN11.6 MW–
AMERSHAMSSEN1–1.5 MW
West WeybridgeUKPN11.5 MW–
IVER 132KVSSEN11.2 MW–

What changed recently

Changes to its sites found in both editions of each pair, newest first.

UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 6 sites matched. 1 site couldn’t be matched between the two editions, because its details changed or it appears in only one.

1 site without a match in the other edition
In the October 2026 edition only (1)
  • Denham WayEastern Power Networks (EPN)Accepted to connect2.5 MW

SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 3 sites matched. Every October site and every November site had a match in the other edition.

No change to any detail QueueWatch tracks for its sites so far.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?