Land At London'S Excel Centre
Net Zero Marine Services Limited at West Ham
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- Net Zero Marine Services Limited
- Site name
- Land At London'S Excel Centre
- Address
- Western Gateway, Canning Town, London, E16 1XL
- Grid reference
- Easting 540777, northing 180751
- Licence area
- London Power Networks (LPN)
- Grid supply point
- West Ham
- Bulk supply point
- West Ham 66kV
- Primary substation
- Silvertown B 11kV
- Connection voltage
- 11 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 1.5 MW registered
- Registered capacity
- 1.5 MW
- Change to maximum export capacity
- 1.5 MW
- Change to maximum import capacity
- 1.5 MW
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- 22 Sep 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Feb 2025
- Tracked since
- September 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at West Ham
GSP view9 other sites at this grid supply point in the November 2026 edition, 3 of them at Silvertown B 11kV, the same primary substation. In all, the sites here total 28.3 MW: 25.3 MW connected, 3 MW accepted to connect.
- North Woolwich RoadMinoco Royal Wharf Energy Centre, Gas and other fossil, Silvertown B 11kV primaryConnected1.4 MW
- Riverside SouthHurley Palmer Flatt Limited, Gas and other fossil, West Ferry Circus 11kV primaryConnected5.7 MW
- Abbey Mills Pumping StationThames Water Utilities Limited, Gas and other fossil, West Ham Grid 11kV primaryConnected4 MW
- Greenwich Peninsula Energy CentreGreenwich Peninsula Energy Centre, Gas and other fossil, Old School Close 11kV primaryConnected1.99 MW
- Barkantine CHPLondon Electricity Services, Gas and other fossil, West Ferry Circus 11kV primaryConnected1.34 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?