QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / Sites

Sites in the DNOs' registers

Every site of 1 MW and over in the six DNOs' latest Embedded Capacity Registers, one row per site, the largest first. Search and filter them by DNO, licence area, technology, status, grid supply point and more: the count and the totals follow, and the page address keeps the search to share.

6,649 sites, 156.7 GW: 43.6 GW connected, 113.1 GW accepted to connect

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Former rafridge clean energy ltdNGEDEast MidlandsSolarAccepted to connect480Bicker Fen 132Kv S Stn
Shoreham Power StationVPI Power LimitedUKPNSouth Eastern Power Networks (SPN)Gas and other fossilConnected460Bolney
WESTON LANE (G)SSENSouthern England (SEPD)SolarAccepted to connect450NURSLING GSP
Gt Yarmouth Power StationE.ON UK PLCUKPNEastern Power Networks (EPN)Gas and other fossilConnected420Norwich
Lynemouth Power StationLynemouth Power StationNorthern PowergridNorth East (Northern Powergrid)Bioenergy and wasteConnected399Blyth 132kV
Elm Tree Solar Wind & BESSElm Tree Solar Wind & BESSNorthern PowergridYorkshire (Northern Powergrid)StorageAccepted to connect394.6Keadby
Kings Lynn Power StationRWE KL LimitedUKPNEastern Power Networks (EPN)Gas and other fossilConnected350Walpole
Peterborough Power StationCentrica PB LimitedUKPNEastern Power Networks (EPN)Gas and other fossilConnected337.5Walpole
Sheringham Shoal Offshore WindfarmNational Grid Electricity Transmission PLCUKPNEastern Power Networks (EPN)WindConnected322Norwich
Colliery Farm SPV & BESSColliery Farm SPV & BESSNorthern PowergridNorth East (Northern Powergrid)SolarAccepted to connect320.3Hawthorn Pit Grid

The target energisation year is offered once a DNO that publishes the date is chosen: the DNOs do not set it the same way, so their dates are not compared.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

Flexible connection

The network operator can reduce how much power the site exports or imports when the local network is busy, usually in return for connecting sooner or more cheaply.

Yes: the register says it has one. No: the register says it doesn't. Not stated: the register leaves it blank.