QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / Sites / Customer

RIDGE CLEAN ENERGY

Customer named in the DNOs' registers

In UKPN's October 2026, NGED's August 2026 and ENWL's September 2026 editions

The registers spell this customer’s name more than one way: “RIDGE CLEAN ENERGY” (2 sites), “Ridge Clean Energy Limited” (2 sites), “Ridge clean energy limited” (1 site) and “ridge clean energy ltd” (1 site).

6sites of 1 MW and over
684 MWcapacity
–connected (0 sites)
684 MWaccepted to connect (6 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNOctober 2026 edition297.4 MW–97.4 MW
NGEDAugust 2026 edition2530 MW–530 MW
ENWLSeptember 2026 edition256.9 MW–56.9 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar3577 MW–577 MW
Wind3107 MW–107 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs' latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Former rafNGEDBicker Fen 132Kv S StnSolarAccepted to connect480
Land on the east side ofNGEDRugeley 132Kv S StnWindAccepted to connect50
(ANM) Coventry FarmUKPNBurwellSolarAccepted to connect49.9
GREAT ORTON ENERGY PARKENWLHARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUPWindAccepted to connect49.9
Coventry FarmUKPNBurwellSolarAccepted to connect47.5
GREAT ORTONENWLHARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUPWindAccepted to connect7

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
Bicker Fen 132Kv S StnNGED1–480 MW
BurwellUKPN2–97.4 MW
HARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUPENWL2–56.9 MW
Rugeley 132Kv S StnNGED1–50 MW

What changed recently

Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.

UKPN, September 2026 edition to October 2026 edition, for this customer's sites: 2 sites matched. Every September site and every October site had a match in the other edition.

NGED: QueueWatch holds one edition of its register so far, the August 2026 edition, so there is nothing to compare yet.

ENWL, May 2026 edition to September 2026 edition, for this customer's sites: 2 sites matched. Every May site and every September site had a match in the other edition.

No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose