Sites in the DNOs’ registers
Every site of 1 MW and over in the six DNOs’ latest Embedded Capacity Registers, one row per site, the largest first. Search and filter them by DNO, licence area, technology, status, grid supply point and more: the count and the totals follow, and the page address keeps the search to share.
Nothing in the registers matches that search, so every site is shown.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Former raf | ridge clean energy ltd | NGED | East Midlands | Solar | Accepted to connect | No source matched | 480 | Bicker Fen 132Kv S Stn |
| Shoreham Power Station | VPI Power Limited | UKPN | South Eastern Power Networks (SPN) | Gas and other fossil | Connected | No source matched | 460 | Bolney |
| WESTON LANE (G) | SSEN | Southern England (SEPD) | Solar | Accepted to connect | No source matched | 450 | NURSLING GSP | |
| Gt Yarmouth Power Station | E.ON UK PLC | UKPN | Eastern Power Networks (EPN) | Gas and other fossil | Connected | No source matched | 420 | Norwich |
| kl | Lynemouth Power Station | Northern Powergrid | North East (Northern Powergrid) | Bioenergy and waste | Connected | Granted | 399 | Blyth 132kV |
| Elm Tree Solar Wind & BESS | Elm Tree Solar Wind & BESS | Northern Powergrid | Yorkshire (Northern Powergrid) | Storage | Accepted to connect | No source matched | 394.6 | Keadby |
| Kings Lynn Power Station | RWE KL Limited | UKPN | Eastern Power Networks (EPN) | Gas and other fossil | Connected | No source matched | 350 | Walpole |
| Peterborough Power Station | Centrica PB Limited | UKPN | Eastern Power Networks (EPN) | Gas and other fossil | Connected | No source matched | 337.5 | Walpole |
| Sheringham Shoal Offshore Windfarm | National Grid Electricity Transmission PLC | UKPN | Eastern Power Networks (EPN) | Wind | Connected | No source matched | 322 | Norwich |
| Colliery Farm SPV & BESS | Colliery Farm SPV & BESS | Northern Powergrid | North East (Northern Powergrid) | Solar | Accepted to connect | No source matched | 320.3 | Hawthorn Pit Grid |
No site matches these filters. Clear a filter to see more.
A Target energisation year filter appears when you choose a DNO that publishes the date. DNOs set this date in different ways, so QueueWatch doesn’t compare it across DNOs.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Flexible connection
The network operator can reduce how much power the site exports or imports when the local network is busy, usually in return for connecting sooner or more cheaply.
Yes: the register says it has one. No: the register says it doesn’t. Not stated: the register leaves it blank.
Planning
The planning decision or stage QueueWatch has for each site: from the Planning Inspectorate’s list of National Infrastructure Projects or DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, where QueueWatch matched the site to a record.
“No source matched” means QueueWatch has not matched the site to a record in either source. It does not mean the site has no planning permission.
The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.