SOUTHERN WATER SERVICES LIMITED

EUROPEAN MARINE ENERGY CENTRE (EMEC) at FAWLEY GSP

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
1 May 2028
Status
Accepted to connect
Customer
EUROPEAN MARINE ENERGY CENTRE (EMEC)
Site name
SOUTHERN WATER SERVICES LIMITED
Address
SOUTHERN WATER SERVICES LIMITED, STEEPHILL ROAD, VENTNOR, ISLE OF WIGHT, PO38 1UB
Grid reference
Easting 455270, northing 77166
Licence area
Southern England (SEPD)
Grid supply point
FAWLEY GSP
Bulk supply point
COWES & WOOTTON COMMON
Primary substation
VENTNOR
Connection voltage
33 kV
Technology group
Hydro and marine
Energy source 1
WATER (FLOWING WATER OR HEAD OF WATER), TIDAL STREAM DEVICES: 19.836 MW registered
Registered capacity
19.836 MW
Change to maximum export capacity
19.836 MW
Change to maximum import capacity
0.526 MW
Flexible connection
Yes
In a connection queue
Not published by SSEN
Date accepted
20 Sep 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
December 2025 edition

Change history

Tracked since the December 2025 edition, across 10 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at FAWLEY GSP

GSP view

27 other sites at this grid supply point in the September 2026 edition, 1 of them at VENTNOR, the same primary substation. In all, the sites here total 812 MW: 473 MW connected, 339 MW accepted to connect.

See all 27

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose