LAND AT IPERS BRIDGE
FUTURENERGY PARTNERS LIMITED at FAWLEY GSP
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Oct 2038
- Status
- Accepted to connect
- Customer
- FUTURENERGY PARTNERS LIMITED
- Site name
- LAND AT IPERS BRIDGE
- Address
- LAND AT IPERS BRIDGE, HOLBURY, SOUTHAMPTON, HAMPSHIRE, SO45 2FS
- Grid reference
- Easting 442818, northing 103178
- Licence area
- Southern England (SEPD)
- Grid supply point
- FAWLEY GSP
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Other or not stated
- Energy source 1
- OTHER, OTHER: 120 MW registered
- Registered capacity
- 120 MW
- Change to maximum export capacity
- 100 MW
- Change to maximum import capacity
- 105.263 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 24 Apr 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- September 2023 edition
Change history
Tracked from the September 2023 edition to the September 2026 edition, across 37 editions.
Changes to the details QueueWatch tracks, newest first.
- October 2026 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
- November 2025 editionTarget energisation date stated as 30 Oct 2038 (not stated in the October 2025 edition)
- May 2024 editionCapacity changed from 150 MW to 120 MW
- May 2024 editionTechnology changed from Storage to Other
Also at FAWLEY GSP
GSP view27 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 692 MW: 473 MW connected, 219 MW accepted to connect.
- ARRETON VALLEY NURSERYTHE ISLE OF WIGHT ENERGY COMPANY LIMITED, Solar, ARRETON NURSERIES primaryConnected33.25 MW
- SOUTHERN WATER SERVICES LIMITEDEUROPEAN MARINE ENERGY CENTRE (EMEC), Hydro and marine, VENTNOR primaryAccepted19.836 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?