QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

BRIDDLESFORD LODGE

ENERGY & SYSTEM TECHNICAL LTD at FAWLEY GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
25 Aug 2028
Status
Accepted to connect
Customer
ENERGY & SYSTEM TECHNICAL LTD
Site name
BRIDDLESFORD LODGE
Address
BRIDDLESFORD LODGE, LAND OFF WHITERAILS ROAD WOOTTON BRIDGE, RYDE, ISLE OF WIGHT, PO33 4RH
Grid reference
Easting 452877, northing 90498
Licence area
Southern England (SEPD)
Grid supply point
FAWLEY GSP
Bulk supply point
COWES & WOOTTON COMMON
Primary substation
VENTNOR
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 28.5 MW registered
Registered capacity
28.5 MW
Change to maximum export capacity
28.5 MW
Change to maximum import capacity
31.579 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
1 Mar 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 25 Aug 2028 (not stated in the October 2025 edition)

Also at FAWLEY GSP

GSP view

26 other sites at this grid supply point in the November 2026 edition, 1 of them at VENTNOR, the same primary substation. In all, the sites here total 692 MW: 473 MW connected, 219 MW accepted to connect.

See all 26

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?