Distribution / Sites / Customer

ENERGY & SYSTEM TECHNICAL LTD

Customer named in the DNOs’ registers

In UKPN’s November 2026 and SSEN’s November 2026 editions

The registers spell this customer’s name more than one way: “ENERGY & SYSTEM TECHNICAL LTD” (2 sites), “Energy & System Technical Limited” (2 sites), “Energy and System Technical Limited” (2 sites) and “Energy And System Technical Limited” (1 site).

7sites of 1 MW and over
117 MWcapacity
43 MWconnected (4 sites)
74 MWaccepted to connect (3 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNNovember 2026 edition544.9 MW42.9 MW2 MW
SSENNovember 2026 edition272.5 MW–72.5 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar5105 MW33 MW72 MW
Gas and other fossil212.1 MW10.1 MW2 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
MANOR FARMSSENBRAMLEY (FLEE)SolarAccepted to connect44
BRIDDLESFORD LODGESSENFAWLEY GSPSolarAccepted to connect28.5
Croydon Solar FarmUKPNEaton SoconSolarConnected14
Kentishes (Lyons Hall)UKPNBraintreeSolarConnected10.8
Shottentons FarmUKPNRye HouseGas and other fossilConnected10.07
Wisbridge FarmUKPNWymondleySolarConnected8
Kingsnorth Industrial Estate, Rochester RoadUKPNKingsnorthGas and other fossilAccepted to connect2

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
BRAMLEY (FLEE)SSEN1–44 MW
FAWLEY GSPSSEN1–28.5 MW
Eaton SoconUKPN114 MW–
BraintreeUKPN110.8 MW–
Rye HouseUKPN110.1 MW–
WymondleyUKPN18 MW–
KingsnorthUKPN1–2 MW

What changed recently

Changes to its sites found in both editions of each pair, newest first.

UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 5 sites matched. Every October site and every November site had a match in the other edition.

SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 2 sites matched. Every October site and every November site had a match in the other edition.

No change to any detail QueueWatch tracks for its sites so far.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips