QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

DURRANTS FARM PV

KS SPV 5 LIMITED at FAWLEY GSP

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
KS SPV 5 LIMITED
Site name
DURRANTS FARM PV
Address
DURRANTS FARM PV, COLEMANS LANE, NEWPORT, ISLE OF WIGHT, PO30 4LX
Grid reference
Easting 445475, northing 90167
Licence area
Southern England (SEPD)
Grid supply point
FAWLEY GSP
Bulk supply point
COWES & WOOTTON COMMON
Primary substation
DURRANTS FARM PV GEN
Connection voltage
33 kV
Technology group
Hydro and marine
Energy source 1
WATER, HYDRO - OTHER: 4.75 MW registered
Registered capacity
4.75 MW
Maximum export capacity
4.75 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000055132450
Import MPAN
2000055132440
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 38 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at FAWLEY GSP

GSP view

27 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 812 MW: 473 MW connected, 339 MW accepted to connect.

See all 27

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose