QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

BOTLEY ENERGY RESERVE 2

BALANCED GRID SOLUTIONS LIMITED at BOTLEY WOOD GSP

SSEN Embedded Capacity Register, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
16 Aug 2027
Status
Accepted to connect
Customer
BALANCED GRID SOLUTIONS LIMITED
Site name
BOTLEY ENERGY RESERVE 2
Address
BOTLEY ENERGY RESERVE 2, TITCHFIELD LANE WICKHAM, FAREHAM, HAMPSHIRE, PO15 6DY
Grid reference
Easting 455138, northing 109927
Licence area
Southern England (SEPD)
Grid supply point
BOTLEY WOOD GSP
Bulk supply point
BOTLEY WOOD
Primary substation
BOTLEY WOOD
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 15 MW registered
Registered capacity
15 MW
Change to maximum export capacity
15 MW
Change to maximum import capacity
15.789 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
14 Nov 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 39 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 16 Aug 2027 (not stated in the October 2025 edition)

Also at BOTLEY WOOD GSP

GSP view

16 other sites at this grid supply point in the October 2026 edition, 2 of them at BOTLEY WOOD, the same primary substation. In all, the sites here total 421 MW: 103 MW connected, 318 MW accepted to connect.

See all 16

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose