QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

PERTH - PERTH & BURGHMUIR DSR

EMTEC ENERGY at BURGHMUIR

SSEN Embedded Capacity Register, June 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Dec 2027
Status
Accepted to connect
Customer
EMTEC ENERGY
Site name
PERTH - PERTH & BURGHMUIR DSR
Address
PERTH - PERTH & BURGHMUIR DSR, VIEWLANDS ROAD WEST, PERTH, PERTHSHIRE AND KINROSS, PH1 1JS
Grid reference
Easting 309529, northing 723597
Licence area
North of Scotland (SHEPD)
Grid supply point
BURGHMUIR
Bulk supply point
Not stated
Primary substation
BURGHMUIR GRID
Connection voltage
11 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 1.24 MW registered
Registered capacity
1.24 MW
Change to maximum export capacity
1.24 MW
Change to maximum import capacity
0.138 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
27 Sep 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked from the August 2023 edition to the June 2026 edition, across 35 editions.

Changes to the details QueueWatch tracks, newest first.

  • July 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
  • November 2025 edition
    Target energisation date stated as 30 Dec 2027 (not stated in the October 2025 edition)

Also at BURGHMUIR

GSP view

6 other sites at this grid supply point in the November 2026 edition, 5 of them at BURGHMUIR GRID, the same primary substation. In all, the sites here total 291 MW: 51 MW connected, 240 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?