PERTH ROYAL INFIRMARY
WGM CONSULTING ENGINEERS at BURGHMUIR
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Jun 2027
- Status
- Accepted to connect
- Customer
- WGM CONSULTING ENGINEERS
- Site name
- PERTH ROYAL INFIRMARY
- Address
- PERTH ROYAL INFIRMARY, TAYMOUNT TERRACE, PERTH, PERTHSHIRE AND KINROSS, PH1 1NX
- Grid reference
- Easting 310411, northing 723623
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- BURGHMUIR
- Bulk supply point
- Not stated
- Primary substation
- BURGHMUIR GRID
- Connection voltage
- 11 kV
- Technology group
- Other or not stated
- Energy source 1
- OTHER, OTHER: 8 MW registered
- Registered capacity
- 8 MW
- Change to maximum export capacity
- 0 MW
- Change to maximum import capacity
- 6.926 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 21 Aug 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- September 2023 edition
Change history
Tracked since the September 2023 edition, across 38 editions. Not found at 1 MW or over in the November 2023 edition.
Changes to the details QueueWatch tracks, newest first.
- November 2025 editionTarget energisation date stated as 30 Jun 2027 (not stated in the October 2025 edition)
- November 2023 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
Also at BURGHMUIR
GSP view5 other sites at this grid supply point in the November 2026 edition, 4 of them at BURGHMUIR GRID, the same primary substation. In all, the sites here total 291 MW: 51 MW connected, 240 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?